Ticino spaghetti harvest Gn15 layout

Small 2ft x 4ft Gn15 layout

NotHarryPotter, Aug 12, 2018
    • NotHarryPotter
      Progress photos on Ticino spaghetti harvest (Gn15). Track is laid. The wiring is next, which will be ultra-simple DC. The point control will use Caboose industries ground throws. As you will see, there is a lot of track and operation that can be fit into a 2ft x 4ft layout. The locos are a mix of Sidelines kits. The lovely maroon job is Gmeinder Gap, a scratchbuilt loco built by Bill Corser in the UK.
    There are no comments to display.