It is amazing what you can do with 50p worth of PVA. using the PVA to create the water for the canal basin and canal has turned out rather well...
I have completed all the scenic work around the canal basin and the canal. The woodyard buildings have been lit and put in their final positions...
Sometimes the smallest of things can take up a lot of time. I have been making woodstacks to put into the woodyard. In the end I had 11 stacks...
I have been working around the canal basin continuing to do the scenic work which has required me to start putting the scrapyard back on the...
I've been carrying on with the scenic work around the branch terminus the canal and its basin. I've also been painting the signaller from Modelu...
With all the structural work done I can start with the scenic work and try out a Woodland Scenic tree making started kit I got at the Warley Show....
I spent Christmas building a pin Arch Laser kit of a signal box including scratch building a lever frame and block signal equipment for the...
After seven years the layout is now structurally complete. Lots more to do by way of scenic work and detailing, and completing parts that were...
At last, after completing the restoration of the upper section with the branch terminus of High Elven, and the cliff face at the front of the...
Finally I have started the work of creating the cliff face and the hillside that links the board on which High Elven sits and the canal basin...
I can't remember when I removed the village of High Elven and its station from the layout as I prepared to change the end where it sits. 18...
A change spot in my local model shop set on me on an unexpected path in decorating the side of the layout, but only after I had slightly...
I have been trying to decide how to support a Bow String Bridge that links the final two stations on the branch line. Left alone with blank paper...
A bit earlier this week posting before I nip off to the Whisky Fringe for the afternoon - 40 distillers with samples to try although I won't be...
After a short summer break time to get back to work. I was asked after my last video whether the Dapol NEM pocket conversion kits could be fitted...
Thanks Ian. I enjoy doing them so there will be more.
The foam sheet arrived to allow me to see whether my idea for carving out of it the main part of the quarry face would work. Fortunately it does....
In the last video I explained my approach to blending the raised area around High Elven with the canal basin below it. A comment from a...
It's been a busy time over the last couple of weeks, and then lurgi struck last week. Some things have been done including mocking up the road...
After my last video I continued to having problems getting the point motors at High Elven to work with the Train Tech DCC unit. Something had to...