Platform 1 Model Railway Community Home 


Welcome to Platform1mrc.com
Thank you for taking the time to browse the forum, if you would like to participate in any of the discussions.
Registration is only a click away Register Here.

 Moderated by: Toto Page:    1  2  3  4  5  6  ...  Next Page Last Page  
New Topic Reply Printer Friendly
Wheeldon Mill.
AuthorPost
 Posted: 20 Dec 2015 17:46
  PM Quote Reply
1st Post
jakesdad13
Professional grumpy old git


Joined: 14 Dec 2015
Location: Chesterfield Derbyshire, United Kingdom
Posts: 1721
Status: 
Offline
This is my introduction to my "O" gauge industrial shunting layout (or plank), Wheeldon Mill, it is loosely based on the steel works near Chesterfield Derbyshire in the UK called Stanton and Staveley Coal and Iron works, now just a distant memory, Wheeldon is a real place though it never played a role in the production of iron or steel it did have a railway running through it, the Great Central loop that closed in the `60s and very little now remains.The layout is 11ft6ins long by 2ft deep, trackwork is peco and points a mixture of peco copper clad and C&L, thats the basics I will go into more detail later in the thread as it develops.Just one photo to start as I think I may have to re-size my photos before uploading, this is the left hand end all track work will be infilled eventually after magnets and re-wiring for DCC.



Cheers for now, Pete.    



____________________
I found it, honest guv!
Back To Top PM Quote Reply  

 Posted: 20 Dec 2015 17:50
  PM Quote Reply
2nd Post
Toto
Founder


Joined: 4 Dec 2015
Location: Edinburgh, United Kingdom
Posts: 8140
Status: 
Offline
Hi Pete,

What rolling stock will you be running on the layout ?

Cheers

Toto



____________________
Sometimes I wish the world was full of Norman Wisdoms. Chaotic ......... Yes, but a world where the sun shines on everyone
Back To Top PM Quote Reply

 Posted: 21 Dec 2015 02:14
  PM Quote Reply
3rd Post
Gary
Golden Goat 2017


Joined: 5 Dec 2015
Location: Sydney, Australia
Posts: 3375
Status: 
Offline
Hi Pete,

I'm looking forward to your thread as I have recently purchased a Lima set, consisting of a 4F with wagons, then I purchased a Lima Class 33. The only track I have is the circle that came with the set...
This thread, will be very inspiring to a new modeller of O gauge. :thumbsup:

Cheers, Gary.



____________________
Industry Lane : http://www.platform1mrc.com/view_topic.php?id=90&forum_id=7

Jay Dubyew Nth Yard : http://www.platform1mrc.com/view_topic.php?id=632&forum_id=7

Linden Ford : http://platform1mrc.com/view_topic.php?id=145&forum_id=8
Back To Top PM Quote Reply  

 Posted: 21 Dec 2015 07:02
  PM Quote Reply
4th Post
jakesdad13
Professional grumpy old git


Joined: 14 Dec 2015
Location: Chesterfield Derbyshire, United Kingdom
Posts: 1721
Status: 
Offline
Hi Tom, thanks for the interest, I have three 040 steam shunters,and two diesel shunters, it will be freight only mostly open wagons, I may have to build a few more as I only have around a dozen or so mind you I have been thinking of painting and lettering the sides differently so I can turn them round and it looks like a different wagon, we will see.

Hi Gary, I hope I can live up to your expectations, its going to be a long build, luckily I have got a good start on it, the track is down I have wired it but I need to make sure its ok for DCC as at the moment its a DC layout, I have read some where that all I need to do is switch on all the sections and I am good to go but with my luck I will burn the whole layout down to the ground! Some of the buildings are well on the way but need finishing, I still haven,t decided where the right hand end of the layout is heading I have a few ideas bouncing around in my head.The locos I have are one finished and running with DCC sound, one nearly complete, my Andrew Barclay, a kit for an 0-4-0 Peckett, a Lima diesel shunter I have Anglicised and an old 03 diesel shunter kit I bought then found only half of it was there,I have got some of the parts to scratch build the chassis though so not too bad.

I will try and find a couple of photos of the real Staveley works to give an idea of what I am trying to achieve.

By for now, Pete.        



____________________
I found it, honest guv!
Back To Top PM Quote Reply

 Posted: 21 Dec 2015 07:21
  PM Quote Reply
5th Post
jakesdad13
Professional grumpy old git


Joined: 14 Dec 2015
Location: Chesterfield Derbyshire, United Kingdom
Posts: 1721
Status: 
Offline
Here are a few photos of Staveley works just after closure and while being demolished, apologies for the picture qualities they are photos of photos but should give an idea of the effects I will aim for.








If I can get the grubby run down feel of the site I will be chuffed to bits :giggle: time will tell.

Cheers, Pete. 



____________________
I found it, honest guv!
Back To Top PM Quote Reply  

 Posted: 21 Dec 2015 08:34
  PM Quote Reply
6th Post
16A
Former Member


Joined: 18 Dec 2015
Location: Nottingham UK, United Kingdom
Posts: 53
Status: 
Offline
Pete...

If I can make a little suggestion... why don't you leave it all wired up as DC with all sections switchable... then... where the two main DC wires enter the layout, wire these to a DPDT switch and have the other two legs wired to your DCC feed - Result: a switchable either or layout and all that needs doing is a DPDT switch... all you'd need to do to get it to DCC is throw the DPDT and ensure all isolated sections are switched to live... saves all the work and you get a better end result... jobs a good 'un.....



____________________
Mike
Back To Top PM Quote Reply

 Posted: 21 Dec 2015 11:59
  PM Quote Reply
7th Post
jakesdad13
Professional grumpy old git


Joined: 14 Dec 2015
Location: Chesterfield Derbyshire, United Kingdom
Posts: 1721
Status: 
Offline
Cheers Mike, I will give it a go, anything for an easier life thats my motto!

Pete.



____________________
I found it, honest guv!
Back To Top PM Quote Reply  

 Posted: 27 Dec 2015 11:11
  PM Quote Reply
8th Post
jakesdad13
Professional grumpy old git


Joined: 14 Dec 2015
Location: Chesterfield Derbyshire, United Kingdom
Posts: 1721
Status: 
Offline
A couple or so pics of the overall set up of the layout.


sorry about the messy workshop!
looking toward the sector plate under the bridge.


the track leads from the sector plate behind the buildings to a two road fiddle.


thats it for now I,ve got to get dinner on.
Cheers, Pete.



____________________
I found it, honest guv!
Back To Top PM Quote Reply

 Posted: 27 Dec 2015 11:17
  PM Quote Reply
9th Post
Keith M
Moderator


Joined: 16 Dec 2015
Location: Morton, Near Alfreton, North Derbyshire., United Kingdom
Posts: 1694
Status: 
Offline
Nice one Pete, watching this one with interest as Wife worked at Staveley works many many moons ago!
Keith.



____________________
I thought I saw a light at the end of the tunnel.........but it was only some swine with a torch, bringing me more work!!!
Back To Top PM Quote Reply  

 Posted: 27 Dec 2015 13:48
  PM Quote Reply
10th Post
Toto
Founder


Joined: 4 Dec 2015
Location: Edinburgh, United Kingdom
Posts: 8140
Status: 
Offline
Hi pete

good stuff. I like the ballasting. well compacted between the sleepers. looks well worn and settled in.

these prototype buildings will keep you busy. great opportunities there though. keep us updated.

cheers

toto



____________________
Sometimes I wish the world was full of Norman Wisdoms. Chaotic ......... Yes, but a world where the sun shines on everyone
Back To Top PM Quote Reply

 Posted: 31 Dec 2015 09:10
  PM Quote Reply
11th Post
jakesdad13
Professional grumpy old git


Joined: 14 Dec 2015
Location: Chesterfield Derbyshire, United Kingdom
Posts: 1721
Status: 
Offline
As part of the foundry I have started to build a small iron smelter, it will mostly be inside another building I have yet to start but I couldn,t help but put detail into it that probably will not be visible, anyway here,s a couple of photo,s  of how far I am up to now.


as you can see it,s nothing fancy, I did try and roll a cone for the top without success so I have cut down an old funnel which seems to have done the trick, I did enjoy emptying the body of the smelter.


The frame is built from plastic I beams with decking made from layers of card with Slaters chequer plate plasticard glued on.


The brick work around the base is from photos and film I have seen.This shows where it will be positioned (roughly) when it is finished and in place.

On the building next to it I have made a (non working) sliding door, I will show a couple of pic,s how I did that in a later post.
I have clad the body of the smelter in plasticard that I scored sheets of riveted iron, with the rivets pressed out from behind.

To get it to roll round the tube I very carefully rolled it so as not to crack it on the scored sections, stuffed it inside a second tube, filled that with boiling water and left it for a few seconds before tipping it out and refilling with cold water, when I took it out it remained curled and is on the tube as shown without any adhesive, I will stick it in place eventually as a belt and braces fix.  

Anyway thats it for now, cheers back later.   Pete.



____________________
I found it, honest guv!
Back To Top PM Quote Reply  

 Posted: 31 Dec 2015 09:16
  PM Quote Reply
12th Post
Toto
Founder


Joined: 4 Dec 2015
Location: Edinburgh, United Kingdom
Posts: 8140
Status: 
Offline
Coming on a treat. I think you've done this before.:avatar:

Keep us posted.

Cheers

Toto



____________________
Sometimes I wish the world was full of Norman Wisdoms. Chaotic ......... Yes, but a world where the sun shines on everyone
Back To Top PM Quote Reply

 Posted: 31 Dec 2015 09:49
  PM Quote Reply
13th Post
mattc6911
Inactive


Joined: 28 Dec 2015
Location: United Kingdom
Posts: 612
Status: 
Offline
Now that looks really Interesting Pete ! a nice and unique scratch build. I know its such a hardship emptying the raw materials but someone has to do it  :thumbs:
   Cheers
       Matt



____________________
Its a what ? and I put it Where ?
Back To Top PM Quote Reply  

 Posted: 31 Dec 2015 19:01
  PM Quote Reply
14th Post
Gary
Golden Goat 2017


Joined: 5 Dec 2015
Location: Sydney, Australia
Posts: 3375
Status: 
Offline
Fantastic scratchbuilding. Very hot water comes in handy for bending styrene sheet. I used this method for bending handrails on my cement silo. :thumbsup:

Looking forward to the rest of this build, Keep up the great work.

Cheers, Gary.



____________________
Industry Lane : http://www.platform1mrc.com/view_topic.php?id=90&forum_id=7

Jay Dubyew Nth Yard : http://www.platform1mrc.com/view_topic.php?id=632&forum_id=7

Linden Ford : http://platform1mrc.com/view_topic.php?id=145&forum_id=8
Back To Top PM Quote Reply

 Posted: 3 Jan 2016 12:06
  PM Quote Reply
15th Post
jakesdad13
Professional grumpy old git


Joined: 14 Dec 2015
Location: Chesterfield Derbyshire, United Kingdom
Posts: 1721
Status: 
Offline
Thank,s for the kind comment Gary, :thumbsup:.

I had a trip to a toy and train fair at Doncaster last week not expecting much in the way of O gauge, I was quite wrong as I managed to pick up a couple of ready built wagons, and if i had been a bit more flush I would have had several more as well as locos, any way these are them, unfortunately I am going to have to ruin the finish on them as they are out of era they have been very well built and I was able to buy them for less than the kit prices.




Thats it for now cheers all, Pete.



____________________
I found it, honest guv!
Back To Top PM Quote Reply  

Current time is 16:11 Page:    1  2  3  4  5  6  ...  Next Page Last Page    
This topic is:  Home Page > Platform 1 Model Railway Community > Model Railway Layouts > Members Personal Layouts > Wheeldon Mill. Top





about cookie files used by this web site

UltraBB 1.172 Copyright © 2007-2016 Data 1 Systems