    I'm planning on build an O gauge micro layout with two tracks, how do I go on about building a sliding traverse.
    Also I need to know how to wire it all up.
    Any help or advice will be most helpful.
     
    jakesdad13 likes this.
  2. Keith M

    Keith M Staff Member Moderator

    Messages:
    4,459
    Likes Received:
    2,911
    Joined:
    Dec 16, 2015
    Dundee Paul will be your man for that info, He's built motorised traversers before so will be able to point you in the right direction.
    Keith.
     
  3. jcm@gwr

    jcm@gwr Full Member

    Messages:
    50
    Likes Received:
    32
    Joined:
    Aug 8, 2020
    Try this-

    youtube.com/watch?v=8B3sJbv5C-o&feature=emb_logo

    I can't seem to make the link, but if you type it in, it should work.
     
  4. Mark4mm

    Mark4mm Guest

    Thanks Keith I will pm Dundee Paul later.
    Jeff thanks for the link most helpful.:thumbs:
     
    jcm@gwr likes this.
  5. paul_l

    paul_l Staff Member Administrator

    Messages:
    9,860
    Likes Received:
    5,916
    Joined:
    Dec 5, 2015
    Have a look at this thread - Toto's Traversers I know its hard going

    Couple of things consider

    Number of tracks in the traverser
    Number of entry / exit roads - if more than 1 does each traverser track have to be able to reach each entry / exit road.

    The first O gauge traverser (the mk 2 subject at the start of Toto's Traverser thread) has 4 tracks, on a 13" wide traverser board. The traverser baseboard is 20" wide, for all tracks to reach the entry exit road the traverser extends beyond the edge of the traverser base board.
    The mk 4 version (later part of the traverser thread), we don't talk about the mk 3, uses 2 x SBR12 500mm linear rails

    [​IMG]

    These are so smooth, with no deflection, and will be used on my future traversers I build.

    Wiring - I'll do the easiest one first

    DCC - yes it really only needs two wires, all tracks wired in parallel and permanently live - each loco is individually controlled via DCC. I would suggest putting some form of end stops to help prevent someone moving the wrong loco (or in the trade referred to as "Toto proofing" :whatever:)

    DC - depends on how you wish to operate the traverser. If someone is at the traverser all the time, then the easiest method is to use a pair of bolts (in the past I've used brass rod and tube) the bolt side is on the entry / exit road, and once aligned the bolt is inserted in to the tube at the side of the traverser track.

    upload_2021-2-9_12-46-20.png

    This ensures only the connected track is live, and can also be used for alignment.

    If the traverser is automated then you will need to use some form of isolation for each traverser track, not too difficult to arange, but still an extra task.

    Paul
     
    Andy_Sollis likes this.
  6. Mark4mm

    Mark4mm Guest

    Paul thank you for the information and pointing me to Toto's thread.:thumbs:
     
    Andy_Sollis likes this.
  7. Echidna

    Echidna Full Member

    Messages:
    241
    Likes Received:
    156
    Joined:
    Oct 15, 2016
    Dear Paul_I ,

    where did you get the traverser rails assembly pictured in #5 above please ?

    Regards, Echidna
     
  8. paul_l

    paul_l Staff Member Administrator

    Messages:
    9,860
    Likes Received:
    5,916
    Joined:
    Dec 5, 2015
    Hi Echidna

    I got mine from Ebay, they are also stocked by Amazon as well. Just picked a couple of examples of suppliers that offer a range of sizes.

    For the 2ft wide traverser, with the entry road roughly in the center - I have a +/- 50mm tolerance for all roads to be able to be used, I selected the 500mm rails, and a 500mm lead screw. The price of ball screws has dropped dramatically and would now use them instead of a Lead screw.

    Another consideration, to allow the traverser to access all four tracks, the traverser extends beyond the baseboard frames, so is advisable to ensure enough clearance between the side frames and the traverser table as this is a trapping hazard, or install some form of emergency stop.

    Paul
     
    Barnaby likes this.