Thanks Gary.... I've taken a lot of inspiration from your Videos and the explanations you give. I had never done scenery before, so it's been a...
WOW.... that's some damage. Looking forward to the updates. Cheers, Geoff.
I've just about finished the Scenery at the road over bridge end of the Layout. [ATTACH] [ATTACH] I posted some pics on the Facebook Group also,...
[ATTACH] The Road Overbridge has been finished.... The track under the Bridge exits to the Fiddle Yard.
The trees have been removed so more Scenery can be added. Point rodding has also been added to the Service Road. The rodding serves the point and...
A bit more progress...... The Loco service road has just about been completed. Trees have been temporally added and base Scenery has been...
I am using the NCE Power Cab to change the points. I have 9 points on the Layout and I had Number Plates for each point 3D printed. These plates...
Plaster is completed and I gave it a coat of paint ready for the dirt going down...[ATTACH]
I was pretty apprehensive about starting my wiring, having not wired a Layout before. I did plenty of research and asked questions on the Forum....
Gary, The rolling stock looks great. Nice detail on them. Where did you get the oranges from? And the cartons, were they hand printed and made...
Thanks for your comments Chris. Once you get used to the NCE Powercab point motor operation, it's pretty easy to operate. I think the trick is...
[ATTACH] A bit more progress..... The backdrop frame is on together with the back scene. The back scene is a Haskell product of an Australian...
The last piece of trackwork was completed today. A catchpoint was added to the Loco servicing siding in order to protect the Mainline and an ash...
Will do.... Cheers, Geoff.
Thanks Gary. Next step is the get the Modules up on their legs, attach the backdrop and make a start on the lighting brackets. Cheers, Geoff....
Thanks Gary. Next step is the get the Modules up on their legs, attach the backdrop and make a start on the lighting brackets. Cheers, Geoff.
Progress has been a bit slow of late. Life tends to get in the way sometimes. Today all the wiring and point motors were installed and the first...
Not much has been happening with the Layout over the last couple of weeks. I have been thinking about the design plan and I have decided to stay...
Gary, thanks for your input. Plenty there to think about. I'm going to Rosehill tomorrow so I'll see if there is some inspiration for me that I...
Thanks for your reply Gary. I've completed all the benchwork and trackwork. The storage area has 1 point with 2 tracks. If I were to scenic that...