With hindsight I felt that just reassigning the block of 8 cement silos with all their dust reclamation gear on top wasn't really applicable to...
This Walthers kit was originally going to be used as part of the colliery site very much as the original kit, but I have since found a great deal...
Added the grid entry to the primary crusher (below ground) which feeds the elevator, heavy duty screen prevents over spill from damaging the...
There are some excellent photos of industrial railways in this flickr thread....
The railway interface of the heavy electrical engineering works. Rail dispatch and goods in, with offices above, the remainder of the works is in...