Easy Build MK 1 Second Corridor

Discussion in 'Kits, Kit bashes & Scratch builds' started by Toto, Sep 5, 2017.

  1. Toto

    Toto I'm best ignored Staff Member Founder Administrator

    Messages:
    15,419
    Likes Received:
    3,842
    Joined:
    Dec 5, 2017
    To make up a three coach train I sent away for this yesterday The optional internal fitments are still to come as they are from a separate place ( same supplier ) ?
    anyway. another to build.
    I'll post the side walls up as it is about the only variation on the Second Composite, and the internal walls and seating arrangement otherwise the build is the same.
    cheers
    toto
     
  2. paul_l

    paul_l Staff Member Administrator

    Messages:
    9,889
    Likes Received:
    5,957
    Joined:
    Dec 5, 2015
    so it should be a fast build then - completed for the end of the week :thumbs:
     
  3. jakesdad13

    jakesdad13 Staff Member Moderator

    Messages:
    4,536
    Likes Received:
    2,072
    Joined:
    Dec 14, 2015
    No probs there Paul to a chap of Totos calibre!!!!!!!!

    Pete.
     
  4. SMR CHRIS

    SMR CHRIS Staff Member Moderator

    Messages:
    3,323
    Likes Received:
    545
    Joined:
    Dec 31, 2015
    paul_l wrote:
    :avatar::avatar: it said easy build, not fast build on the end of the box the basic body goes together fast then all those window etches slow you down.:facepalm:
     
  5. Toto

    Toto I'm best ignored Staff Member Founder Administrator

    Messages:
    15,419
    Likes Received:
    3,842
    Joined:
    Dec 5, 2017
    The corridor etches arrived as well. They came separate. Rail match maroon paint and some rail match matt black as well.

    Reading the instructions and it doesn't really recommend when to paint the sides. Before or after Windows Nd door hinges etc are fitted or even before you got the sides to the rest of the kit.

    I think after the sides are fitted but before the hinges etc. Anybody know better ?
     

Share This Page