7 Foot x 2 Foot Plan Needed

Discussion in 'Planks, Switching and Shelf Layouts' started by Tim47, Apr 12, 2024.

  1. Gary

    Gary Wants more time for modelling.... Staff Member Administrator

    Messages:
    7,363
    Likes Received:
    3,920
    Joined:
    Dec 5, 2015
    Couple of plans using Peco Streamlined Code 100 track...

    Without a Goods Shed...

    With a Goods Shed...

    Cheers, Gary.
     
  2. Tim47

    Tim47 Full Member

    Messages:
    13
    Likes Received:
    7
    Joined:
    Mar 29, 2024
    Hi Gary it is this one i need the list for please [​IMG]
     
  3. Tim47

    Tim47 Full Member

    Messages:
    13
    Likes Received:
    7
    Joined:
    Mar 29, 2024
    the one with the goods shed gary please
    i managed to upload it gary

    it is the list for this one please
     

    Attached Files:

  4. Jim Freight

    Jim Freight Full Member

    Messages:
    1,149
    Likes Received:
    936
    Joined:
    Sep 9, 2019
    Hi Gary, Keith is agreeing with you, i.e. manual frog polarity switching is required without a 'frog juicer', Jim :)
     
  5. Gary

    Gary Wants more time for modelling.... Staff Member Administrator

    Messages:
    7,363
    Likes Received:
    3,920
    Joined:
    Dec 5, 2015
    Hi Jim,
    Now I have re-read the post, yes Keith is agreeing. Note to self : Don't read posts when tired... :whatever:
     
    Last edited: Apr 16, 2024
    Jim Freight likes this.
  6. Keith M

    Keith M Staff Member Moderator

    Messages:
    4,460
    Likes Received:
    2,911
    Joined:
    Dec 16, 2015
    I think you misunderstand me Gary, I was attempting to explain why not changing the polarity of the point frog would cause a short circuit, your method is fine but might be difficult to achieve only using the 'hand-of-god' to change points without 'wire-in-tube' changing slideswitch position simultaneously.
    Keith.
     
  7. Keith M

    Keith M Staff Member Moderator

    Messages:
    4,460
    Likes Received:
    2,911
    Joined:
    Dec 16, 2015
    I also should read following posts before replying too.:avatar:
    Keith.
     
  8. Gary

    Gary Wants more time for modelling.... Staff Member Administrator

    Messages:
    7,363
    Likes Received:
    3,920
    Joined:
    Dec 5, 2015
    Track list for Track Plan 2 'With Goods Shed'...


    I have included both options with Electrofrog points and Insulfrog points. You choose which direction you wish to go, Electrofrog v Insulfrog...

    Electrofrog Points
    SLE-99 (3 way point) x 1
    SLE-96 (right hand point) x 2
    SLE-95 (left hand point) x 4

    Insulfrog Points
    SL-99 (3 way point) x 1
    SL-96 (right hand point) x 2
    SL-95 (left hand point) x 4

    Flex Track
    SL-100 x 10

    Cheers, Gary.
     
    gormo likes this.
  9. Tim47

    Tim47 Full Member

    Messages:
    13
    Likes Received:
    7
    Joined:
    Mar 29, 2024
    Up And Running Now Many Thanks For All The Help :thumbs:
     
    Gary, jakesdad13 and gormo like this.

Share This Page