There appears to be some interest in my Arkitex project so what I propose with the permission of the P1MRC administrators is to make available to...
Introduction In this series of articles I explain my approach to expanding the Tri-ang Arkitex (00) system using 3D filament printing to add...
Here is a list of articles in this series with active links, originally it was ad-hoc, I did not expect it to become such a large project. Now I...
The shed and attached workshop provide a covered area in which to provide light servicing and repair to the locomotives assigned to Warren Yard...
Choice It is very necessary to adopt a suitable track standard as soon as possible to avoid expensive mistakes later on. I had already decided...
At the quarry end of the site dump trucks bring the limestone out of the quarry and empty it into the primary crusher, here the ground is much...
Finally started bedding in the buildings so they no longer look as though they are just placed there without any foundations. For a long while I...
Here are some more information source links and a book, mainly of Blue Circle cement works and terminals, a link to my first information thread...
Structure (20) on the site map, https://platform1mrc.com/p1mrc/index.php?threads/cement-works-10-site-map-explained.5333/ stores the clinker...
This post kiln structure (20) on the site map https://platform1mrc.com/p1mrc/index.php?threads/cement-works-10-site-map-explained.5333/ stores...
This post kiln structure (23) performs the grinding to powder of the clinker and the mixing in of gypsum to create the final cement product, hence...
I haven't posted much lately as the weather has been too cold in recent months for paint spraying in my shed, but I have converted a bedroom which...
This is structure 27 on the site map. Ref - https://platform1mrc.com/p1mrc/index.php?threads/cement-works-10-site-map-explained.5333/ It receives...
As a separate structure this is the largest transfer house (TH) on the cement site, structure 26 on the site map. Ref -...
Views of the buildings comprising the process up to the kiln are shown placed and connected by conveyors. Aerial Conveyors. 1) Crusher to bulk...
This stage is the mixing before firing to create clinker, hence pre-mix, structure 11 on the site map. Ref -...
I thought I had already posted a thread about this layout, but I hadn't so here goes... The Box Street micro HO scale switching / shunting layout...
Having recently joined, I thought I'd post a little about the project I've been working on and off for the last couple of years. Not much physical...
This cement works is based in the 1960s and there are very few models available for this era. Present day trucks can carry payloads of well over...
Part of my expansion of the Walthers Valley Cement works cement manufacturing process is the addition of silica sand. Situated between the...